Steel Buildings- Designing the Building
Steel building projects usually require the end customer to hire a design professional to help with the construction project. Usually, it is the responsibility of the design professional to specify the design requirements for the steel building system to be used by the dealer to order from the supplier. These design requirements should include all applicable design loads.
If the end customer chooses not to retain the services of a design professional, it is the responsibility of the end customer
If the end customer chooses not to retain the services of a design professional, it is the responsibility of the end customer
to specify the design criteria to be used for the steel building system. This design criteria must include all applicable design loads.
If the end customer chooses not to retain the services of a design professional, it is the responsibility of the end customer to specify the design criteria to be used for the steel building system. This design criteria must include all applicable design loads.
For the project, it is the responsibility of the steel building dealer to interpret all of the end customer's specifications and incorporate the appropriate specifications, design criteria, and design loads into the order documents submitted to the supplier.
It is the responsibility of the supplier to design the steel building system to meet the design criteria and design loads that have been specified by the dealer in the order documents. The supplier is not responsible for making an independent determination of any local codes or other requirements that have not been specified in the order documents.
The supplier is only responsible for the structural design of the steel building system it sells to the dealer. The supplier's engineer is not to be considered the design professional for the construction project. The supplier is not responsible for the design of any components or materials that are not connected with the steel building system unless this design responsibility is stated in the order documents.
The building supplier is responsible for compliance with the specifications, design requirements, and design loads, and other information relating to the incorporation of the steel building system into the construction project as has been specified by the order documents
If the end customer chooses not to retain the services of a design professional, it is the responsibility of the end customer to specify the design criteria to be used for the steel building system. This design criteria must include all applicable design loads.
For the project, it is the responsibility of the steel building dealer to interpret all of the end customer's specifications and incorporate the appropriate specifications, design criteria, and design loads into the order documents submitted to the supplier.
It is the responsibility of the supplier to design the steel building system to meet the design criteria and design loads that have been specified by the dealer in the order documents. The supplier is not responsible for making an independent determination of any local codes or other requirements that have not been specified in the order documents.
The supplier is only responsible for the structural design of the steel building system it sells to the dealer. The supplier's engineer is not to be considered the design professional for the construction project. The supplier is not responsible for the design of any components or materials that are not connected with the steel building system unless this design responsibility is stated in the order documents.
The building supplier is responsible for compliance with the specifications, design requirements, and design loads, and other information relating to the incorporation of the steel building system into the construction project as has been specified by the order documents